VFD • MCC • PLC/HMI • POWER DISTRIBUTION
Electrical Panels
VFD/MCC panels, PLC & HMI, power distribution for cranes and process lines. Builder estimates heat load, enclosure & cooling, MCCB/busbar sizing and gives a budget price.
- VFD / Soft Starter
- PLC & HMI
- MCC / Distribution
- IP54–IP65
CE/IEC compliance · GA & wiring drawings · FAT report · 2-Year Warranty
- IEC 60204-1
- CE/ISO Practices
- SCCR to site fault level
- 2-Year Warranty
Motion Control
VFDs for hoist/CT/LT, S-curve, brake logic, encoder or sensorless.
PLC & HMI
Siemens/Schneider/ABB/Omron PLC, 7–10″ HMI, diagnostics & logging.
Safety & SCCR
E-stop/limits, overload, STO (VFD), SCCR up to 100 kA.
Thermal Management
Heat load estimate, filtered fans or AC cooling packages.
Engineered for Reliability & Serviceability
- Clean wiring – labeled terminals, ducts, spare I/O.
- Easy maintenance – hinged doors, gland plates, service space.
- Scalable – single-bay to multi-bay with busbar trunking.
- Fully documented – GA, single-line, I/O list, FAT report.
Build Your Spec
Panel Snapshot
- Type
- —
- Enclosure
- —
- Total kW
- —
- Heat Load
- —
- MCCB / Busbar
- —
- PLC / HMI
- —
- Cooling
- —
- Status
- OK
Heat ≈ VFD kW × 3.5 % + PLC/HMI. MCCB ≈ 1.25×I. Budgetary only.
Budget Estimate
Auto-updates from “Build Your Spec”. Ex-works range. Final quote after drawings & validation.
- Panel
- —
- Power & Protection
- —
- Controls & Cooling
- —
- Quantity / Timeline
- —
Applications & Examples


Technical Specifications
| Panel Types | VFD control, MCC (mixed VFD/starters), PLC I/O, main distribution |
|---|---|
| Voltage | 380–480 V, 50/60 Hz, 3Ph; control 24–110 V AC/DC |
| Enclosures | Powder-coated steel or 304/316 stainless; IP54–IP65; floor or wall mount |
| Drives | Siemens/Schneider/ABB/Danfoss VFD, soft starters, encoder or sensorless vector |
| PLC & HMI | Siemens, Schneider, ABB, Omron; 7–15″ HMI, Modbus/Profinet/Ethernet/IP |
| Protection | MCCB/MCB, thermal-magnetic, STO, surge, filters, SCCR 25–100 kA |
| Documentation | GA, single-line, wiring, I/O list, FAT report, manuals |
From Inquiry to Commissioning
- 01 · SizingMotor list, I/O, environment
- 02 · ProposalGA & budget
- 03 · ManufacturingWiring & tests
- 04 · FATFunction & safety
- 05 · CommissioningOn-site support
Get Pricing & Lead Time
Share motor kW, PLC/HMI preference, enclosure, IP and SCCR. We’ll return drawings and a firm quote within 24–48 h.
Note
Heat rise, SCCR, EMC and cable fill are validated at proposal stage.
Error: Contact form not found.
