CLEANROOM • WASHDOWN • C5M MARINE
Cleanroom & Corrosion-Resistant Electric Wire Rope Hoist
0.5–32 t typical · Monorail / Low Headroom / Double-Rail / Stationary · ISO/FEM M4–M6 · IP66/IP69K options · SS304/SS316 or C5M coatings · H1 food-grade lubrication
- ISO 5–8 cleanroom
- IP66/IP69K washdown
- SS304/SS316 package
- Low-outgassing cable set
For pharma, food & beverage, lithium battery dry rooms, semiconductors & coastal plants · CE/ISO compliant · Factory particle & washdown checks (optional).
- ISO 14644
- IP66/IP69K
- ISO 12944 C5M
- NSF H1 lubricants
- CE/ISO
Hygienic Design
Smooth covers, sealed bearings, drip pans, enclosed rope drum options.
Corrosion Protection
SS304/SS316 hardware or C5M multi-coat system maximizes marine/chemical areas.
Clean Materials
Low-outgassing cable sets, H1 food-grade grease, white epoxy (non-yellowing).
Flexible Configs
Monorail low-headroom, double-rail crab or stationary modules.
Built for Clean & Harsh Environments
- Cleanroom packages: ISO 5–8 options with sealed motors, non-shedding cable carriers.
- Washdown ready: IP66 standard, IP69K for high-pressure sanitation on request.
- Anti-corrosion: stainless fasteners/shafts or C5M coating stack with verified DFT.
- Food & pharma: H1 lubricants, smooth surfaces, optional stainless rope and hooks.
Build Your Spec
Quote Snapshot
- Capacity
- 5 t
- Lift Height
- 12 m
- Hoist Speed
- 8 m/min
- Config
- Monorail – Low Headroom
- Reeving
- 4/1
- Duty
- M5
- Cleanroom
- ISO 5
- IP
- IP66
- Corrosion
- C4
- Materials
- Painted Carbon Steel
- Rope/Hook
- Galvanized + Standard
- Lubrication
- Standard Industrial
- Cable
- Standard
- Finish
- Industrial Epoxy (200–240 µm)
- Ambient
- Standard (-10~+40°C)
- Quantity
- 1
- Timeline
- —
- Est. Motor Power
- 3.6 kW
- Headroom Estimate
- ~720 mm
- Package Summary
- ISO 5 · IP66 · C4
kW ≈ 1.2 × (Capacity×9.81×Speed/60) ÷ 0.75. Headroom varies by configuration; final per GA drawing. Coating DFT shown for reference; final PDS as issued.
Budget Estimate
Auto‑updates from “Build Your Spec”. Budgetary range (ex‑works). Final quote after drawings & package confirmation.
- Capacity
- —
- Lift Height
- —
- Hoist Speed
- —
- Configuration
- —
- Reeving
- —
- Duty
- —
- Cleanroom
- —
- IP
- —
- Corrosion
- —
- Materials
- —
- Rope/Hook
- —
- Lubrication
- —
- Cable
- —
- Finish
- —
- Ambient
- —
- Quantity
- —
- Timeline
- —
Applications & Examples
Technical Specifications
| Type | Cleanroom & corrosion-resistant electric wire rope hoist — monorail (standard/low-headroom), double-rail trolley or stationary |
|---|---|
| Rated Capacity | 0.5–32 t standard (custom up to 50 t) |
| Lift Height | 6–30 m typical |
| Hoisting Speed | 4–12 m/min (VFD or two-speed) |
| Trolley Speed | 10–40 m/min (VFD) |
| Duty Group | ISO/FEM M4–M6 |
| Cleanroom | ISO 5–8 package; sealed motors, non-shedding cable carriers, smooth covers & drip pans |
| Washdown / IP | IP66 standard; IP69K optional for high-pressure cleaning |
| Corrosion Protection | SS304/SS316 hardware or C5M multi-coat system (DFT 320–400 µm) per ISO 12944 |
| Materials | Industrial epoxy (white/grey) or stainless assemblies; stainless rope & hooks optional |
| Lubrication | Standard or NSF H1 food-grade; low-outgassing cable sets available |
| Rope & Guide | High-grade wire rope with hardened guide & grooved drum; stainless option |
| Controls | Pendant / Radio remote; PLC diagnostics optional |
| Power | 380/415/440V, 50/60Hz, 3Ph |
| Docs | Coating PDS & DFT report; cleanroom/washdown validation checklist; FAT report |
From Inquiry to Commissioning
- 01 · SizingShare load, lift, speed, duty, clean class, IP & corrosion class
- 02 · ProposalGA drawing & budget; headroom, approach & finish schedule
- 03 · ManufacturingCoating DFT & material certs; optional particle/washdown checks
- 04 · DeliveryCrating & logistics
- 05 · CommissioningOn-site testing & docs
Get Pricing & Lead Time
Tell us capacity, lift, speed, configuration, reeving, duty, plus cleanroom class, IP, corrosion class, materials and lubrication. We’ll optimize headroom, approach & finish schedule for your plant.
Note
Final finish schedule (materials, color, DFT) will be confirmed on GA/BOQ and issued in PDS. Cleanroom/washdown validation available on request.
